Indicative Electrical Wiring Costs in Malaysia
Market rates based on SIRIM / Suruhanjaya Tenaga approved cables (Mega / Southern) and MK / Schneider switches.
| Item / Work Scope | Billing Unit | Indicative Range (RM) | Notes & Specification |
|---|---|---|---|
| Lighting Point (Surface PVC conduit) | per point | RM 70 – RM 100 | Includes 1.5mm² wire & single gang switch |
| Lighting Point (Concealed wall hacking) | per point | RM 110 – RM 160 | Includes wall hacking, PVC conduit, plaster & switch |
| 13A Power Point (Concealed double socket) | per point | RM 140 – RM 220 | Includes 2.5mm² copper wire & MK/Schneider double socket |
| 15A / 20A Heavy Power Point (Water heater / Aircond / Hob) | per point | RM 180 – RM 300 | Includes 4.0mm² wire & dedicated MCB breaker at DB |
| DB Box Upgrade (Single Phase 20-30 Way) | unit | RM 1,200 – RM 2,200 | Includes new metal/PVC DB enclosure, main switch, ELCB & MCBs |
Compiled from direct market research of published Malaysian contractor pricing. Indicative only — verify current rates for your project.
What electrical point quotations include
- Cable routing using pure copper SIRIM approved 1.5mm² / 2.5mm² wires.
- PVC conduit casing or wall hacking & plastering.
- Installation of standard white single/double switch or socket plate.
- Testing and circuit labeling at main DB.
What is charged separately
- TNB meter upgrade fees & direct utility deposits.
- Designer switch/socket plates (e.g. Schneider AvatarOn).
- Supply of light fixtures, chandeliers, ceiling fans or water heaters.
- 3-Phase DB box upgrade from 1-Phase supply.
Key cost drivers in electrical wiring
Concealed vs Surface Wiring
Wall hacking, conduit embedding and plaster re-finishing costs RM 35 – RM 60 more per point.
Power Cable Rating
15A high-power points for oven/hob/water heater require 4.0mm² cable, costing RM 180 – RM 320 per point.
DB Box Capacity
Upgrading an old DB box to a modern 20-30 way DB box with ELCB/RCCB costs RM 1,200 – RM 2,500.
Illustrative Electrical Wiring Sourcing Example
Illustration for a 3-bedroom condo rewiring & DB box upgrade. Final offer follows team review.
Price Guide FAQs
How much does a new electrical point cost in Malaysia?
Surface lighting points start at RM 70 – RM 90, while concealed 13A double power socket points range from RM 140 to RM 220 per point.
When is full house rewiring necessary?
Homes over 20–25 years old with old non-SIRIM wiring should undergo full rewiring for fire safety.
How can HargaReno lower my electrical quotation?
Upload your quotation. We review cable specifications and point count breakdowns to source 10–20% lower pricing.
